Closing Time
By Jesse Morgan
So we’re finally closing on the house. We close on the 27th, and take possession on Sunday the 29th. We have a lot of work ahead of us.
The Todo list goes something like this after moving everything and getting settled:
- [X] Change locks
- [X] Build child door over stairwell
- [_] Replace broken glass panes in both bedrooms
- [_] Clean out bird nests in vents in roof, add screens outside
Next up is things we should do over the next 2 months:
- [_] replace latch/fix front storm door
- [_] replace leaky pipe over utility sink
- [_] Install faucet on utility sink
- [_] Add railing to stairwell
- [_] Replace front steps
- [_] Replace bathub hardware and reseal bathtub
- [_] fix/replace leaky sprayer on kitchen sink
- [_] install no-backflow spigot in back of house
Items that we’ll need to buy immediately:
- [_] Foot coverings for furniture (bed, dressers, crib, couches)
- [\] stairwell door, hinges and latch
- [_] staplegun
- [_] screen
- [x] shop vac
- [x] dehumidifier
- [\] Two brooms [1 already]
- [\] Two mops [1 already]
- [\] Two mop buckets [1 already]
- [_] Trash bags
- [_] Trash cans
- [x] Duct tape
- [_] Fiberglass ladder
- [x] Garden hose
- [x] 2-3 plungers
- [_] Biggest multi-pack of Chlorox wipes that you can find at Costco/SAMS
- [_] Biggest multi-pack of paper towels that you can find at Costco/SAMS
- [_] Biggest multi-pack of TP that you can find at Costco/SAMS
- [_] Door chains
- [_] Pole/type door locks if they fit your doors.
- [\] Light bulbs [already have big box of energy savers]
- [_] Duster on a stick (for cobwebs)
- [x] Lawnmower
- [x] Heavy Duty Extension Cord
Anything else I’m missing?